Accessibility statement
Last updated: October 4, 2026
Ce document existe en français : version française.
Teyvor wants Teyvor and this website to be usable by everyone, including people using screen readers, keyboards, voice control or magnification. We aim to meet WCAG 2.1 Level AA, the benchmark behind the European Accessibility Act (EN 301 549), the Americans with Disabilities Act guidance and similar rules.
What we do
- Semantic headings, landmarks and labels on forms; visible keyboard focus on every control.
- Colour is never the only signal: statuses come with an icon and text. Text contrast targets 4.5:1.
- Light and dark themes, resizable text, layouts that adapt to small screens.
- Motion is limited and respects the "reduce motion" setting.
- Every schedule change you can make by dragging a bar can also be made by typing in the table.
Known limits
- The Gantt chart is a visual, pointer-first view; its table alongside is the accessible way to read and edit the same data.
- PDF and image exports of the Gantt are generated from the visual view and may not be fully accessible; CSV exports are the accessible alternative.
Tell us about a barrier
If something is hard to use, write to info@teyvorpm.com with the page and what happened. We reply within 5 working days and will offer an alternative format when we cannot fix it immediately. Last reviewed October 4, 2026.